HWY CORBETT ST over I 495

2 MI N I93 · County 009, Massachusetts · Built 1962 · 2 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
A09035305DOTNBI
Year Built
1962
Length
53.9 m (176.8 ft)
Max Span
26.5 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
2,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,383,000
Total Project Cost
$6,575,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.