ST 28 SB/N MAIN ST over I 495 RAMP D

1.8 MI N ANDOVER CENTER · County 009, Massachusetts · Built 1962 · 2 Lanes · 16,293 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
A090422YRDOTNBI
Year Built
1962
Reconstructed
1988
Length
33.8 m (110.9 ft)
Max Span
12.5 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
16,293
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,024,000
Total Project Cost
$4,537,000