I 495 SB over RR MBTA/BMRR

2.6 MI N I93 · County 009, Massachusetts · Built 1962 · 3 Lanes · 55,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
A090372Y0DOTNBI
Year Built
1962
Length
40.2 m (131.9 ft)
Max Span
14.6 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
55,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,632,000
Total Project Cost
$6,949,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.