HWY S UNION CONN over HWY SOUTH ST

AT ANDOVER TOWN LINE · County 009, Massachusetts · Built 1962 · 1 Lanes · 10,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L04042318DOTNBI
Year Built
1962
Length
37.2 m (122 ft)
Max Span
14.3 m
Width
10 m (32.8 ft)
Lanes
1
Daily Traffic
10,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,467,000
Total Project Cost
$3,701,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.