ST 28 FELLSWAY over RR BMRR (ABANDONED)

AT RAILROAD · County 017, Massachusetts · Built 1850 · 4 Lanes · 28,190 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M120084DVDOTNBI
Year Built
1850
Reconstructed
1956
Length
10.7 m (35.1 ft)
Max Span
9.1 m
Width
28.9 m (94.8 ft)
Lanes
4
Daily Traffic
28,190
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,064,000
Total Project Cost
$3,097,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.