ST 16 REV BCH PKWY over COMB RIVERS EDGE&MBTA&O

.2 MI E OF FELLSWAY · County 017, Massachusetts · Built 2018 · 8 Lanes · 68,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M12017BGBDOTNBI
Year Built
2018
Length
62.9 m (206.4 ft)
Max Span
37.2 m
Width
40.2 m (131.9 ft)
Lanes
8
Daily Traffic
68,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.