ST 99 SB/MAIN ST over RR MBTA/BMRR/CSX
30 M S OF JCT SR16&SR99 · County 017, Massachusetts · Built 1954 · 3 Lanes · 42,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.401589, -71.060958
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 72 years old.
Nearby Bridges
ST 99 SB/BROADWAY over ST 16 REV BCH PKWY
Built 1956
ST 99 NB/BROADWAY over RR MBTA/BMRR/CSX
Built 1956
ST 99 NB/BROADWAY over ST 16 REV BCH PKWY
Built 1956
ST 16 RAMP over RR MBTA/BMRR
Built 1954
ST 16 REV BCH PKWY over RR MBTA/BMRR
Built 1956
HWY TILESTON ST over TR NRTHRN STRAND COMM
Built 2002
ST 16 REV BCH PKWY over WATER MALDEN RIVER
Built 2018
ST 16 REV BCH PKWY over COMB RIVERS EDGE&MBTA&O
Built 2018
ST 99 ALFORD ST over WATER MYSTIC RIVER
Built 1963
ST 28 FELLSWAY over WATER MYSTIC RIVER
Built 1935
Bridge Details
- Structure #
- E120013GHDOT634
- Year Built
- 1954
- Length
- 39.3 m (128.9 ft)
- Max Span
- 25.9 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 3
- Daily Traffic
- 42,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,026,000
- Total Project Cost
- $6,040,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.