HWY DEPOT ST over RR PWRR

.3 MI. W OF ST 122 · County 027, Massachusetts · Built 2006 · 2 Lanes · 2,860 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
G080128HGDOT634
Year Built
2006
Length
31 m (101.7 ft)
Max Span
14.5 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
2,860
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,693,000
Total Project Cost
$4,040,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.