HWY PLEASANT ST over WATER BLACKSTONE CANAL

1.4 MI SW OF RTE 122 · County 027, Massachusetts · Built 1956 · 2 Lanes · 5,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
G080081BRMUNNBI
Year Built
1956
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
5,600
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$573,000
Total Project Cost
$860,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.