HWY PLEASANT ST over WATER BLACKSTONE RIVER

1.3 MI SW OF RTE 122 · County 027, Massachusetts · Built 2009 · 2 Lanes · 3,082 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
G0800761EMUNNBI
Year Built
2009
Length
27.2 m (89.2 ft)
Max Span
13.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
3,082
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.