HWY DEPOT ST over WATER BLACKSTONE RIVER

0.1M N OF RT122A @GRAFTON · County 027, Massachusetts · Built 1957 · 2 Lanes · 1,551 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
S330041HUMUNNBI
Year Built
1957
Length
26.1 m (85.6 ft)
Max Span
23.8 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,551
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,613,000
Total Project Cost
$2,420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.