ST122 A/MAIN ST over WATER BLACKSTONE CANAL
.5 MI N OF JCT ST-122 · County 027, Massachusetts · Built 1898 · 2 Lanes · 4,452 vehicles/day
Overall
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.177325, -71.690181
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 128 years old.
Nearby Bridges
ST122 A/MAIN ST over RR PWRR
Built 1999
ST122 A/MAIN ST over WATER BLACKSTONE RIVER
Built 1957
HWY DEPOT ST over RR PWRR
Built 2006
HWY DEPOT ST over WATER BLACKSTONE CANAL
Built 1956
HWY DEPOT ST over WATER BLACKSTONE RIVER
Built 1925
HWY PLEASANT ST over WATER BLACKSTONE CANAL
Built 1956
HWY PLEASANT ST over WATER BLACKSTONE RIVER
Built 2009
HWY PLEASANT ST over WATER QUINSIGAMOND RIVER
Built 1886
HWY DEPOT ST over WATER BLACKSTONE RIVER
Built 1957
HWY MILLBURY ST over WATER QUINSIGAMOND RIVER
Built 1953
Bridge Details
- Structure #
- G080161YXDOTNBI
- Year Built
- 1898
- Length
- 9.6 m (31.5 ft)
- Max Span
- 9.6 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 4,452
- Material
- Masonry
- Design
- Arch - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $561,000
- Total Project Cost
- $842,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.