HWY SUTTON ST over WATER BLACKSTONE RIVER

JUST W OF ST 122 · County 027, Massachusetts · Built 1956 · 2 Lanes · 6,354 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N210031CXMUNNBI
Year Built
1956
Reconstructed
1999
Length
29 m (95.1 ft)
Max Span
27.4 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
6,354
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,097,000
Total Project Cost
$4,646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.