ST122 PROVDENCE RD over RR PWRR
1.5 MI. S. OF GRAFTON TL · County 027, Massachusetts · Built 1941 · 2 Lanes · 5,317 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.145147, -71.644628
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 85 years old.
Nearby Bridges
ST122 PROVDENCE RD over WATER BLACKSTONE RIVER
Built 2013
HWY SUTTON ST over WATER BLACKSTONE RIVER
Built 1956
HWY CHURCH ST over WATER BLACKSTONE RIVER
Built 1924
HWY CHURCH ST over RR PWRR
Built 1900
HWY PLEASANT ST over WATER WEST RIVER
Built 1959
HWY WEST RIV ST over WATER WEST RIVER
Built 1959
HWY HARTFORD AVE over WATER WEST RIVER
Built 1956
HWY SAMUEL DRV over WATER CARPNTR RSV INLT N
Built 2005
HWY SAMUEL DRV over WATER CARPNTR RSV INLT S
Built 2005
HWY GLEN AVE over WATER WEST RIVER
Built 1937
Bridge Details
- Structure #
- N2101322HDOT634
- Year Built
- 1941
- Reconstructed
- 1994
- Length
- 64.6 m (211.9 ft)
- Max Span
- 21.3 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 5,317
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,355,000
- Total Project Cost
- $6,533,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.