ST 24 over HWY BEDFORD ST
1.0 MI N OF I 195 · County 005, Massachusetts · Built 1955 · 4 Lanes · 37,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
41.695986, -71.122847
This bridge is in worse condition than 14% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 71 years old.
Nearby Bridges
ST 24 @ STA 91 over WATER INTERCEPTOR DRAIN
Built 1955
ST 24 NB (LINE B) over ST 24 SB (LINE C)
Built 1961
HWY MERIDIAN ST over ST 24
Built 1955
HWY QUEQUECHAN over WATER QUEQUECHAN RIVER
Built 1895
ST 24 NB (LINE B) over I 195 WB
Built 1961
I 195 & RAMP B over OTHER BIKEWAY(BCRR)
Built 1963
US 6 WB/EASTRN AV over I 195
Built 1965
US 6 EB/EASTRN AV over I 195
Built 1965
ST 24 EXTENSION/RI over I 195
Built 1963
I 195 over HWY QUEQUECHAN ST
Built 1963
Bridge Details
- Structure #
- F020453MEDOTNBI
- Year Built
- 1955
- Reconstructed
- 2011
- Length
- 13.7 m (44.9 ft)
- Max Span
- 12.2 m
- Width
- 27.2 m (89.2 ft)
- Lanes
- 4
- Daily Traffic
- 37,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $248,000
- Total Project Cost
- $373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.