HWY MERIDIAN ST over ST 24
AT ST 24 · County 005, Massachusetts · Built 1955 · 2 Lanes · 3,486 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.709964, -71.118653
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 71 years old.
Nearby Bridges
HWY PRESIDENT AV over ST 24
Built 1955
ST 24 over HWY BEDFORD ST
Built 1955
HWY WEAVER ST over RR MACRR
Built 2024
ST 79 SW RAMP over RR MACRR
Built 1974
HWY N MAIN ST over ST 79
Built 1958
ST 79 over RR MACRR
Built 1974
ST 24 @ STA 91 over WATER INTERCEPTOR DRAIN
Built 1955
HWY BRIGHTMAN ST over RR MACRR
Built 1900
HWY HERMAN ST over ST 79
Built 1958
I 195 & COLLECTOR over OTHER BIKEWAY
Built 1965
Bridge Details
- Structure #
- F020443XEDOTNBI
- Year Built
- 1955
- Length
- 61 m (200.1 ft)
- Max Span
- 18.3 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,486
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,199,000
- Total Project Cost
- $9,299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.