HWY PRESIDENT AV over ST 24

2.4 M NO. OF I 195 · County 005, Massachusetts · Built 1955 · 4 Lanes · 8,635 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 5 Fair

Location

41.713247, -71.118181

This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 71 years old.

Nearby Bridges

Bridge Details

Structure #
F0204341BDOTNBI
Year Built
1955
Length
40.5 m (132.9 ft)
Max Span
19.8 m
Width
27.1 m (88.9 ft)
Lanes
4
Daily Traffic
8,635
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,214,000
Total Project Cost
$10,822,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.