ST 79 over RR MACRR

MP QNF 9.34 · County 005, Massachusetts · Built 1974 · 6 Lanes · 36,983 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F020543V9DOTNBI
Year Built
1974
Length
16.5 m (54.1 ft)
Max Span
15.5 m
Width
29.4 m (96.5 ft)
Lanes
6
Daily Traffic
36,983
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,457,000
Total Project Cost
$2,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.