HWY HERMAN ST over ST 79

1.4 MI S OF ST 24 · County 005, Massachusetts · Built 1958 · 2 Lanes · 3,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F020523XFDOTNBI
Year Built
1958
Reconstructed
2016
Length
35 m (114.8 ft)
Max Span
16 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
3,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,706,000
Total Project Cost
$2,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.