ST 24 NB (LINE B) over ST 24 SB (LINE C)

RAMP 195E TO 24N @ WATUPA · County 005, Massachusetts · Built 1961 · 1 Lanes · 7,534 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
F020733MLDOTNBI
Year Built
1961
Reconstructed
1991
Length
47.2 m (154.9 ft)
Max Span
21.3 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
7,534
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$555,000
Total Project Cost
$833,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.