ST 24 SB RAMP over I 195 WB

@ WATTUPPA RAMP TO 195 EB · County 005, Massachusetts · Built 1961 · 1 Lanes · 9,308 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F020723MKDOTNBI
Year Built
1961
Length
61.3 m (201.1 ft)
Max Span
29.6 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
9,308
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,583,000
Total Project Cost
$5,375,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.