US 6 EB/EASTRN AV over I 195
AT I 195 · County 005, Massachusetts · Built 1965 · 2 Lanes · 8,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.682239, -71.130611
This bridge is in worse condition than 33.3% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 61 years old.
Nearby Bridges
US 6 WB/EASTRN AV over I 195
Built 1965
ST 24 EXTENSION/RI over I 195
Built 1963
ST 24 over OTHER BIKEWAY(BCRR)
Built 1963
ST 24 NB (LINE B) over I 195 WB
Built 1961
ST 24 over HWY BRAYTON AVE
Built 1963
ST 24 NB (LINE B) over ST 24 SB (LINE C)
Built 1961
ST 24 SB RAMP over I 195 WB
Built 1961
I 195 RAMP A over RR SPURR (ABANDONED)
Built 1963
I 195 & RAMP B over OTHER BIKEWAY(BCRR)
Built 1963
ST 24 @ STA 91 over WATER INTERCEPTOR DRAIN
Built 1955
Bridge Details
- Structure #
- F020703NXDOTNBI
- Year Built
- 1965
- Reconstructed
- 1991
- Length
- 42.4 m (139.1 ft)
- Max Span
- 20.1 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 8,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,015,000
- Total Project Cost
- $4,523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.