US 6 WB/EASTRN AV over I 195
AT I 195 · County 005, Massachusetts · Built 1965 · 2 Lanes · 8,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.682236, -71.130414
This bridge is in worse condition than 33.3% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 61 years old.
Nearby Bridges
US 6 EB/EASTRN AV over I 195
Built 1965
ST 24 EXTENSION/RI over I 195
Built 1963
ST 24 NB (LINE B) over I 195 WB
Built 1961
ST 24 over OTHER BIKEWAY(BCRR)
Built 1963
ST 24 over HWY BRAYTON AVE
Built 1963
ST 24 NB (LINE B) over ST 24 SB (LINE C)
Built 1961
ST 24 SB RAMP over I 195 WB
Built 1961
I 195 RAMP A over RR SPURR (ABANDONED)
Built 1963
I 195 & RAMP B over OTHER BIKEWAY(BCRR)
Built 1963
ST 24 @ STA 91 over WATER INTERCEPTOR DRAIN
Built 1955
Bridge Details
- Structure #
- F020703NWDOTNBI
- Year Built
- 1965
- Reconstructed
- 1990
- Length
- 41.1 m (134.8 ft)
- Max Span
- 20.1 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 8,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,945,000
- Total Project Cost
- $4,418,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.