I 195 over HWY QUEQUECHAN ST
1 MI. E. OF ST.24 · County 005, Massachusetts · Built 1963 · 7 Lanes · 68,442 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
41.68815, -71.140153
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 63 years old.
Nearby Bridges
HWY QUEQUECHAN over WATER QUEQUECHAN RIVER
Built 1895
I 195 & RAMP B over OTHER BIKEWAY(BCRR)
Built 1963
I 195 RAMP A over RR SPURR (ABANDONED)
Built 1963
ST 24 EXTENSION/RI over I 195
Built 1963
ST 24 over OTHER BIKEWAY(BCRR)
Built 1963
ST 24 over HWY BRAYTON AVE
Built 1963
I 195 & COLLECTOR over OTHER BIKEWAY
Built 1965
US 6 EB/EASTRN AV over I 195
Built 1965
US 6 WB/EASTRN AV over I 195
Built 1965
I 195 over ST 81 PLYMOUTH AVE
Built 1964
Bridge Details
- Structure #
- F020683TMDOTNBI
- Year Built
- 1963
- Length
- 24.4 m (80.1 ft)
- Max Span
- 23.5 m
- Width
- 37.2 m (122 ft)
- Lanes
- 7
- Daily Traffic
- 68,442
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,038,000
- Total Project Cost
- $9,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.