I 195 over HWY QUEQUECHAN ST

1 MI. E. OF ST.24 · County 005, Massachusetts · Built 1963 · 7 Lanes · 68,442 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
F020683TMDOTNBI
Year Built
1963
Length
24.4 m (80.1 ft)
Max Span
23.5 m
Width
37.2 m (122 ft)
Lanes
7
Daily Traffic
68,442
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,038,000
Total Project Cost
$9,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.