US 6 (EAST BRG) over WATER ACUSHNET RIVER

AT NEW BEDFORD CITY LINE · County 005, Massachusetts · Built 1901 · 4 Lanes · 32,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F010023PGDOTNBI
Year Built
1901
Reconstructed
1962
Length
206 m (675.9 ft)
Max Span
22.9 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
32,200
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$29,162,000
Total Project Cost
$43,744,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.