US 6 (MIDDLE BRG) over WATER ACUSHNET RIVER

.4 MI W OF NBED C.L. · County 005, Massachusetts · Built 1901 · 4 Lanes · 32,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F010023PHDOTNBI
Year Built
1901
Reconstructed
1996
Length
118.9 m (390.1 ft)
Max Span
25.3 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
32,200
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,765,000
Total Project Cost
$25,148,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.