US 6 (DRAWBRIDGE) over WATER ACUSHNET RIVER

.4 MI W OF NBED · County 005, Massachusetts · Built 1900 · 4 Lanes · 32,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F010023PFDOTNBI
Year Built
1900
Reconstructed
1997
Length
86.3 m (283.1 ft)
Max Span
43.3 m
Width
21.5 m (70.5 ft)
Lanes
4
Daily Traffic
32,200
Material
Steel
Design
Movable - Swing
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,144,000
Total Project Cost
$18,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.