US 6 WB over COMB ST18 & RELIEF

.75 M W OF FAIRHAVEN TL · County 005, Massachusetts · Built 1973 · 2 Lanes · 21,952 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
N060293P0DOTNBI
Year Built
1973
Length
76.8 m (252 ft)
Max Span
27.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
21,952
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,049,000
Total Project Cost
$7,574,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.