HWY HILLMAN ST over ST 18 & RAMP A

.2 MI NW OF US 6 · County 005, Massachusetts · Built 1973 · 2 Lanes · 12,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N060313Y1DOTNBI
Year Built
1973
Length
56.7 m (186 ft)
Max Span
22.9 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
12,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,625,000
Total Project Cost
$8,438,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.