HWY ADAMS ST over I 195

1.0 MI W OF ST 240 · County 005, Massachusetts · Built 1974 · 2 Lanes · 3,286 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
F010103PXDOTNBI
Year Built
1974
Length
55.8 m (183.1 ft)
Max Span
26.8 m
Width
16.1 m (52.8 ft)
Lanes
2
Daily Traffic
3,286
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,730,000
Total Project Cost
$8,596,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.