ST240 over I 195

1M N OF RTE 6 · County 005, Massachusetts · Built 1972 · 4 Lanes · 23,794 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
F010123PYDOTNBI
Year Built
1972
Length
61 m (200.1 ft)
Max Span
29.9 m
Width
29.5 m (96.8 ft)
Lanes
4
Daily Traffic
23,794
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,874,000
Total Project Cost
$17,812,000