HWY HOWLAND RD over WATER ACUSHNET RIVER

AT NEW BEDFORD LINE · County 005, Massachusetts · Built 1962 · 2 Lanes · 15,380 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
F010013JBMUNNBI
Year Built
1962
Length
44.5 m (146 ft)
Max Span
42.7 m
Width
17.2 m (56.4 ft)
Lanes
2
Daily Traffic
15,380
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$5,025,000
Total Project Cost
$7,538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.