I 195 over ST 18 ASHLEY BLVD

.25 MI E OF PENNIMAN ST · County 005, Massachusetts · Built 1965 · 5 Lanes · 62,062 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
N060203U1DOTNBI
Year Built
1965
Length
152.6 m (500.7 ft)
Max Span
28.3 m
Width
26.9 m (88.3 ft)
Lanes
5
Daily Traffic
62,062
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$26,720,000
Total Project Cost
$40,081,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.