I 195 over COMB MACRR/PURCHASE ST

.1 MI W OF ST 18 · County 005, Massachusetts · Built 1965 · 6 Lanes · 62,062 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
N060203TYDOTNBI
Year Built
1965
Length
103.5 m (339.6 ft)
Max Span
31.7 m
Width
26.9 m (88.3 ft)
Lanes
6
Daily Traffic
62,062
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$33,061,000
Total Project Cost
$49,592,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.