US 1 RP ABUT-BT50 over HWY ARLINGTON ST

1.3 KM NE OF TOBIN BR. · County 025, Massachusetts · Built 1957 · 1 Lanes · 850 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
C090073ACDOTNBI
Year Built
1957
Reconstructed
2021
Length
97.5 m (319.9 ft)
Max Span
22.9 m
Width
11 m (36.1 ft)
Lanes
1
Daily Traffic
850
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.