US 1 NB/S ABT PR1 over HWY ARLINGTON & 5TH ST

.7 MI NE OF TOBIN BR. · County 025, Massachusetts · Built 1957 · 3 Lanes · 41,988 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
C090073ABDOTNBI
Year Built
1957
Reconstructed
2021
Length
266.4 m (874 ft)
Max Span
24.4 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
41,988
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.