US 1 SB RAMP over HWY ORANGE ST

.8 MI N OF TOBIN BR. · County 025, Massachusetts · Built 1956 · 1 Lanes · 9,143 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
C090113A9DOTNBI
Year Built
1956
Reconstructed
2022
Length
144.8 m (475.1 ft)
Max Span
21.3 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
9,143
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.