HWY BROADWAY over RR MBTA & SILVER LINE

1.6 KM S OF JCT US1&SR16 · County 025, Massachusetts · Built 1917 · 2 Lanes · 12,931 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C090023FMDOT634
Year Built
1917
Reconstructed
1988
Length
25 m (82 ft)
Max Span
22.6 m
Width
21 m (68.9 ft)
Lanes
2
Daily Traffic
12,931
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$709,000
Total Project Cost
$1,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.