US 1 SB BTS 36/PR over HWY ARLINGTON & 5TH ST

.2 MI NE OF TOBIN BR. · County 025, Massachusetts · Built 1957 · 3 Lanes · 48,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C090073A6DOTNBI
Year Built
1957
Reconstructed
2021
Length
381.9 m (1253 ft)
Max Span
25.6 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
48,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.