HWY BELLNGHM ST over RR MBTA SILVER LINE

2.4 KM S OF JCT US1&SR16 · County 025, Massachusetts · Built 1993 · 2 Lanes · 3,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
C090033FNDOT634
Year Built
1993
Length
18.4 m (60.4 ft)
Max Span
16.9 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,451,000
Total Project Cost
$2,177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.