HWY BENNINGTN ST over HWY MARTIN COUGHLIN BY

305 M S OF SUFFOLK DOWNS · County 025, Massachusetts · Built 1906 · 6 Lanes · 28,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B160713GYDOT634
Year Built
1906
Reconstructed
1982
Length
19.2 m (63 ft)
Max Span
18.3 m
Width
46.2 m (151.6 ft)
Lanes
6
Daily Traffic
28,100
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,200,000
Total Project Cost
$1,801,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.