I 90 WB & RP1ASB over OTHER RELIEF

SEGMENT 3 · County 025, Massachusetts · Built 1999 · 4 Lanes · 60,129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B16588585DOTNBI
Year Built
1999
Length
45.6 m (149.6 ft)
Max Span
45.6 m
Width
17.7 m (58.1 ft)
Lanes
4
Daily Traffic
60,129
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,343,000
Total Project Cost
$17,015,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.