ST 1 A/SB over OTHER RELIEF

SEGMENT 1 · County 025, Massachusetts · Built 1999 · 1 Lanes · 22,241 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B16589584DOTNBI
Year Built
1999
Length
141.7 m (464.9 ft)
Max Span
47.2 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
22,241
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,824,000
Total Project Cost
$22,237,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.