I 90 WB & RP1ASB over COMB SR-14 & BLUE LINE

SEGMENT 1 · County 025, Massachusetts · Built 2002 · 3 Lanes

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B16588587MPANBI
Year Built
2002
Length
139.8 m (458.7 ft)
Max Span
48.2 m
Width
16.2 m (53.1 ft)
Lanes
3
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,498,000
Total Project Cost
$30,748,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.