ST 1 A over HWY BNINGTN & NEPTUNE

1 MI N OF CALLAHAN TUN. · County 025, Massachusetts · Built 1951 · 6 Lanes · 33,770 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B1623639WDOTNBI
Year Built
1951
Reconstructed
1977
Length
216.4 m (710 ft)
Max Span
24.4 m
Width
36.7 m (120.4 ft)
Lanes
6
Daily Traffic
33,770
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$51,702,000
Total Project Cost
$77,554,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.