HWY RAMP L NB ON over ST 3 NB

.16 KM SW OF RAMP F · County 021, Massachusetts · Built 1981 · 2 Lanes · 15,076 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B2105934UDOTNBI
Year Built
1981
Length
44.5 m (146 ft)
Max Span
43.6 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
15,076
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,823,000
Total Project Cost
$2,735,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.