ST 3 SB over I 93

ST 3 AT I 93 · County 021, Massachusetts · Built 1957 · 3 Lanes · 41,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
B2102934ADOTNBI
Year Built
1957
Reconstructed
1978
Length
57.9 m (190 ft)
Max Span
28.3 m
Width
14.4 m (47.2 ft)
Lanes
3
Daily Traffic
41,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,423,000
Total Project Cost
$8,135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.