HWY ON RAMP F over HWY RAMP C (Q ADAMS)

.3MI CAPENS CIRCLE RD C · County 021, Massachusetts · Built 1978 · 2 Lanes · 9,992 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B2106234NDOTNBI
Year Built
1978
Length
23 m (75.5 ft)
Max Span
21.3 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
9,992
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$973,000
Total Project Cost
$1,460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.