HWY RAMP CC over ST 3 & RAMPS C&F

AT ST 3 SB · County 021, Massachusetts · Built 1981 · 2 Lanes · 23,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B2106334WDOTNBI
Year Built
1981
Length
101.5 m (333 ft)
Max Span
44.3 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
23,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,152,000
Total Project Cost
$10,729,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.