ST 3 RAMP Y @ T over OTHER RELIEF
AT T. STATION · County 021, Massachusetts · Built 1981 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.232222, -71.010278
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 45 years old.
Nearby Bridges
ST 3 RAMP X @ T over HWY RAMPS C & CC
Built 1981
ST 3 RAMP X&Y @T over HWY CENTRE ST
Built 1981
ST 3 RAMP XX over HWY CENTRE ST
Built 2009
ST 3 RPS CC&C&X&Y over RR CSX SPUR TO LEDGER
Built 1981
HWY ON RAMP F over HWY RAMP C (Q ADAMS)
Built 1978
ST 3 NB over HWY RAMP C (Q ADAMS)
Built 1978
HWY RAMP CC over ST 3 & RAMPS C&F
Built 1981
ST 3 SB over HWY RAMP C (Q ADAMS)
Built 1978
HWY RAMP F over HWY RAMP B NB QA ON RP
Built 1981
ST 3 & RAMPS over WATER TOWN BROOK
Built 1980
Bridge Details
- Structure #
- Q010512GUDOTNBI
- Year Built
- 1981
- Length
- 150.3 m (493.1 ft)
- Max Span
- 25 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,313,000
- Total Project Cost
- $13,970,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.