ST 3 RAMP Y @ T over OTHER RELIEF

AT T. STATION · County 021, Massachusetts · Built 1981 · 2 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
Q010512GUDOTNBI
Year Built
1981
Length
150.3 m (493.1 ft)
Max Span
25 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
1,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,313,000
Total Project Cost
$13,970,000